It sat empty on Pipeline Road.

A donut shop built in 1969, closed, with a for lease sign still in the window. What the City of Hurst and HEB ISD did with the building is easier to watch than to explain.

Press play. The people who did the work tell it better than we can.

“The Coffee Shop,” produced by the City of Hurst. Captions available on the player.
The Coffee Shop Project

How it happened.

A shop that is also a classroom

The Coffee Shop Project is a collaborative initiative between the City of Hurst and the Hurst-Euless-Bedford Independent School District designed to revitalize an older commercial corridor while providing hands-on workforce training for local students and young adults. Located at 420 W. Pipeline Road, the city-owned shop serves high-quality beverages and baked goods while operating as a real-world learning environment for students in the Gene A. Buinger Career and Technical Education Academy Culinary Program and the MARC Transition program, which provides workforce preparation for special education students.

It started with a survey

The idea originated from a resident survey showing strong interest in a sit-down coffee shop in the historic Pipeline Road area. In response, the City transformed a deteriorating former donut shop built in 1969 into a welcoming and functional community asset. Local businesses, volunteers, and nonprofit partners contributed materials, time, and expertise, creating a sense of shared ownership and community pride in the project.

What it gives back

Students gain valuable workplace experience, residents enjoy a new gathering place that supports neighborhood connection, and the business community benefits from a pipeline of job-ready talent. The Coffee Shop now serves as a model of adaptive reuse, inclusive workforce development, and community-driven revitalization, reflecting Hurst’s long-standing commitment to connection, collaboration, and educational opportunity.

The work of that culinary program is on the menu. Come taste it.

The renovation

Vacant, gutted, rebuilt, open.

Seven photos from the build, in order. Move through them at your own pace.

The former donut shop, vacant and up for lease, with a “closed” sign and faded donut posters still in the windows.
Before: the 1969 donut shop, closed and up for lease at 420 W. Pipeline Road.
Demolition in full swing: the ceiling torn open and debris covering the floor, with the old bakery racks and oven still in place.
Demolition begins. The ceiling comes down over the old bakery racks.
The gutted shell after demolition, stripped back to bare joists and block walls, with the original menu board still hanging in the window.
Stripped to the bones. The original menu board is still in the window.
The old roof structure opened up during teardown, its timber beams framed against a clear blue sky.
The old roof, opened up to the sky.
New plumbing roughed in through the concrete slab.
New plumbing goes in through the slab.
Fresh spray-foam insulation and new framing as the rebuild takes shape.
Spray-foam insulation and new framing. The rebuild takes shape.
The finished Coffee Shop at 420 W. Pipeline Road, lit up in the evening.
Open. 420 W. Pipeline Road, Hurst.

1 of 7

Come see it for yourself.

The building is open, the students are behind the counter, and the coffee is ready. Stop in at 420 W. Pipeline Road.

Get Directions See the Menu

Mon–Fri 6:30 AM–3 PM · Sat 7 AM–4 PM · Sun 7 AM–2 PM · lobby & drive-thru Hours, parking & drive-thru